Detalhes
-
Autor
-
Data do documento
2020/06/23
-
TIpo de documento
Situação da implementação e relatório dos resultados
-
No. do relatório
ISR42145
-
Nº do volume
1
-
Total Volume(s)
1
-
País
-
Região
-
Data de divulgação
2020/06/23
-
Disclosure Status
Disclosed
-
Nome do documento
Disclosable Version of the ISR - Sindh Resilience Project - P155350 - Sequence No : 08
-
Palavras-chave
flood and drought risk; disaster and climate risk management; flood embankment; civil works; small dam; natural disaster; disaster risk management; emergency operations center; Investment Project Financing; million people; early warning; operational procedure; medical equipment; test kit; quarantine facility; health authorities; operation risk; land area; project intervention; survey results; irrigation department; public consultation; emergency response; infrastructure component; infrastructure contract; Disaster Management; safety measure; vulnerability assessment
- Exibir mais
Downloads
COMPLETAR RELATÓRIO
Versão oficial do documento (pode conter assinaturas, etc.)
- PDF oficial
- TXT*
- Total Downloads** :
- Download Stats
-
*A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.