Skip to Main Navigation

Chile - ENDESA Power Expansion Project (Inglês)

The ENDESA Power Expansion Project in Chile will finance most of the foreign exchange costs of (a) installing an additional 49,000 kw of generating capacity in the Abanico hydroelectric plant (present capacity 86,000 kw); (b) constructing a hydroelectric plant with a generating capacity of 48,900 kw on the Huanehue River near Lake Pullinque; (c) constructing the La Isla hydroelectric power plant with a generating capacity of 68,000 kw, and (d) erecting transmission lines and constructing new or enlarging existing substations. This project will add about 406,000 kw in generating capacity and will increase production by about 2.1 billion kw a year, it will more than double Endesa's generating capacity, and will enable Chile to continue to develop and expand its industrial and agricultural production.

Detalhes

  • Data do documento

    1956/10/31

  • TIpo de documento

    Relatório sobre Avaliação do Pessoal

  • No. do relatório

    TO122

  • Nº do volume

    1

  • Total Volume(s)

    1

  • País

    Chile,

  • Região

    América Latina e Caribe,

  • Data de divulgação

    2010/06/18

  • Disclosure Status

    Disclosed

  • Nome do documento

    Chile - ENDESA Power Expansion Project

  • Palavras-chave

    installed capacity;payment of customs duty;payment of debt service;Energy;private company;hydro plant;foreign exchange requirement;transmission and distribution;interest during construction;public service companies;increases in revenues;lack of rainfall;cost materials;rate of growth;Fixed Assets;generating capacity;construction expenditures;amortization payment;secondary transmission;power requirement;mining operation;transmission facility;industrial expansion;diesel plant;Electric Power;hydro development;seasonal storage;agricultural activity;heavy investment;transmission system;steam capacity;industrial area;peak load;dry year;revenue account;rural area;central regions;hydroelectric potential;direct purchase;bank finance;cash payment;tariff rate;investment finance;construction period;historical development;mining company;local costs;pending legislation;mining companies;geographical region;summer months;small mining;net operating;hydro potential;share capital;capital share;replacement value;water flow;government law;mining town;foreign currency;capital reserve;debit balance;heavy rainfall;short-term borrowing;Cash flow;financial arrangement;bulk power;distribution company;distribution facility;pump irrigation;demand forecast;mechanical difficulty;hydro site;irrigation district;currency cost;industrial plant;consumption increase;heavy industry;oil field;Hydroelectric Power;future prospect;small industry;small mine;hydro capacity;surplus power;total energy;residential consumption;postwar period;arid region;financial prospect;grace period;construction schedule;field study;agricultural production;climatic condition;civil engineering;summer peak;energy forecast;reservoir capacity;municipal company;transmission line;international boundary;

Downloads

COMPLETAR RELATÓRIO

Versão oficial do documento (pode conter assinaturas, etc.)

  • PDF oficial
  • TXT*
  • Total Downloads** :
  • Download Stats
  • *A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.