Nepal - Second Bridges Improvement And Maintenance Program : environmental assessment : Terms of reference for consulting services for environmental impact assessment (Inglês)

Government of Nepal (GON) prepared the second Bridges Improvement and Maintenance Program (BIMP–II) under the Ministry of Physical Infrastructure and Transport (MoPIT)/Department of Roads (DoR) with assistance from the World Bank. This program includes Technical Assistance (TA) component to support GoN in conducting relevant social impact assessments (SIAs) – inter alia - aimed at preparation of site-specific social management plans (SMPs) including resettlement action plans (RAPs), vulnerable community development plans (VCDPs) and, engineering designs/detailed project reports (DPRs), etc. for potential bridge and road projects in transport sector. Tasks under this Terms of Reference (ToR) are envisaged to commence from subproject identification/feasibility study, include detailed SIA culminating into preparation of site-specific RAPs, VCDPs and other social management plans based on findings of the SIA, and be undertaken in tandem with environmental studies/plan preparations and DPR/design works for the corresponding sub-project site.

Detalhes

  • Data do documento

    2018/04/01

  • TIpo de documento

    Avaliação Ambiental

  • No. do relatório

    125364

  • Nº do volume

    1

  • Total Volume(s)

    1

  • País

    Nepal,

  • Região

    Sul da Ásia,

  • Data de divulgação

    2018/04/17

  • Disclosure Status

    Disclosed

  • Nome do documento

    Terms of reference for consulting services for environmental impact assessment

  • Palavras-chave

    Environmental Assessment; Environmental and Social Management Plan; Occupational health and safety; construction and operation; physical cultural resources; community health and safety; environmental assessment and management; information on climate change; land acquisition act; generic terms; Land Acquisition and Resettlement; legal and regulatory framework; effect of climate change; environmental and social assessments; construction of access road; Environmental Management Plan; Donor funded projects; assessment process; planning and design; adverse environmental impact; social and environmental; natural habitat; critical natural habitats; land use change; emergency management plan; legally protected areas; household survey data; description of services; resettlement and rehabilitation; public consultation process; implications for forests; flora and fauna; ground water quality; requirements for performance; diversion of traffic; Cumulative Environmental impact; consultations with stakeholders; source of financing; contract amount; bridge work; environmental risk; mitigation measure; consultancy service; technical feasibility; approval process; Traffic Safety; environmental mitigation; social acceptability; stakeholder engagement; payment method; Cultural Heritage; environmental science; grievance management; national requirement; minimum requirement; storm event; environmental screening; independent assessment; aquatic life; public notice; bridge construction; wildlife migration; labor camp; capacity strengthening; contractual arrangement; baseline data; safety management; line item; Natural Resources; applicable legislation; Consulting services; Environmental Planning; stakeholder consultation; logistical support; contract agreement; staff resource; data management; environmental safeguard; forested areas; social surveys; environmental perspective; approximate cost; bridge improvement; environmental aspect; assessment finding; legislative provision; environmental investigation; assessment tool; gender need; social aspect; displaced people; positive impact; efficient performance; social issue; contracting procedure; monitoring program; beneficial impact; construction contractor; environmental problem; impact area; environmental condition; livelihood base; surface water; noise level; grazing area; water resource; population information; hilly area; land holding; subsistence activities; ethnic group; vulnerable group; socioeconomic survey; construction technique; physical environment; baseline assessment; environmental implication; consultation strategy; monthly temperature; study area; flash flood; flood map; flood level; urbanized area; industrial area; federal structure; construction material; road upgrade; inherent risk; road work; cultural site; north-south corridor; engineering design; complementary environmental; construction methodology; comparative analysis; information dissemination; secondary data; primary data; induced impacts; environmental settings; environmental legislation; terrestrial wildlife; protected species; biological environment; technology selection; water source; migratory species; laboratory testing; increased speed; monitoring requirement; field survey; safety issue; survey instrument; environmental enhancement; social impact; cultural property; institutional responsibilities; environmental study; applied geology; adequate treatment; community safety; construction camp; cumulative impact; wastewater management; construction impact

Downloads

COMPLETAR RELATÓRIO

Versão oficial do documento (pode conter assinaturas, etc.)

  • DOCX
  • PDF oficial
  • TXT*
  • Total Downloads** :
  • Download Stats
  • *A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.