The Nangbeto Hydroelectric Project will: (i) help to minimize the long-term cost of electricity supply in Benin and Togo; (ii) provide hydropower (63 MW) and energy (about 150 GWh annually) to help meet increased demand for electricity and reduce fuel costs and improve CEB's interconnected system operation. (iii) Furthermore, The project plans to strengthen power sector institutions in both countries and, in particular, CEB's co-ordinating role and the sectors capability in planning, engineering, management and financial operations; and (iv) improve sector efficiency through technical assistance and a joint training program. The proposed project comprises: (a) the Nangbeto hydroelectric development, and associated transmission, together with related engineering and other services. It also involves; (b) studies of the feasibility of a future hydroelectric project (Adjarala) and load dispatching arrangements; (c) technical assistance; and (d) training.
Detalhes
-
Data do documento
1984/06/30
-
TIpo de documento
Relatório sobre Avaliação do Pessoal
-
No. do relatório
4839
-
Nº do volume
1
-
Total Volume(s)
1
-
País
-
Região
-
Data de divulgação
2010/06/18
-
Disclosure Status
Disclosed
-
Nome do documento
Togo - Nangbeto Hydroelectric Project - Benin
-
Palavras-chave
Feasibility studies; Electricity; Dams; Institution building; Hydroelectric power; Power distribution; Resettlement; Sector studies; Spillways; Transformers; Transmission lines; Turbines; Africa
- Exibir mais
Downloads
COMPLETAR RELATÓRIO
Versão oficial do documento (pode conter assinaturas, etc.)
- PDF oficial
- TXT*
- Total Downloads** :
- Download Stats
-
*A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.