Ratings for the Capacity-Building for Palestinian Economic and Regulatory Institutions Project for West Bank and Gaza were as follows: outcomes were moderately satisfactory, risk to development outcome was moderate, Bank performance was moderately satisfactory, and Borrower performance was moderately satisfactory. Some lessons learned included: resilient national institutions in FCS are critical for enabling development; Measurable, concrete, and targeted indicators (‘SMART’ indicators) are critical, especially in capacity-building and reform-focused projects to help measure and track change. Closely linked to this, a clear results chain at the design stage is essential to show from the start how inputs lead to outputs, outcomes, and higher-level, longer-term effects; capacity-building and institutional reforms are not only more challenging tomeasure, but often take longer to be realized; too many implementing agencies centralized in one project implementation structure can introduce implementation delays and inefficiencies, particularly for procurement.
Detalhes
-
Data do documento
2016/12/19
-
TIpo de documento
Conclusão da Implementação e Relatórios sobre Resultados
-
No. do relatório
ICR3957
-
Nº do volume
1
-
Total Volume(s)
1
-
País
-
Região
-
Data de divulgação
2017/01/05
-
Disclosure Status
Disclosed
-
Nome do documento
West Bank and Gaza - Capacity-Building for Palestinian Economic and Regulatory Institutions Project
-
Palavras-chave
finance and markets;legal and regulatory framework;council of minister;Public Information and Awareness;food and agricultural;project design and implementation;economic and financial analysis;supply use;tax administration activity;civil service pension;tax administration reform;public sector spending;public procurement reform;project management structure;fragile and conflict;assessment of outcome;country assistance strategy;national procurement;finance and planning;General Finance Sector;cost of goods;Exchange Rates;outputs by components;assessment of risk;personal income tax;Country Assistance Strategies;international quality standards;intermediate outcome;public procurement procedure;delays in disbursement;interest rate risk;banking system stability;recurrent budget deficit;internal audit function;agricultural census;project approval;consulting service;Consulting services;improved public;pension system;pension reform;Tax Reform;intermediate indicator;fiscal position;reserve management;
- Exibir mais
Downloads
COMPLETAR RELATÓRIO
Versão oficial do documento (pode conter assinaturas, etc.)
- DOCX
- PDF oficial
- TXT*
- Total Downloads** :
- Download Stats
-
*A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.