This paper provides project workflow definitions for the South-East Copper Segment Resource Corridor Project in Afghanistan. Over the next 8 to 10 years, the World Bank in collaboration with the Afghanistan Ministry of Mines and Australian Aid plans to develop a number of resource corridors across the country. A two-part methodology is utilized for working with datasets on the human and natural environment of Afghanistan. The first part, or process, assigns a score for each 250m square area within the South-East Copper Segment Corridor to indicate their level of development potential. This process is based on trials in other parts of the country where very good local knowledge has been used to confirm that the outputs match local conditions. The second process revolves around the evaluation of mean statistics within 5km square areas placed across the development potential landscape. This second part incorporates additional intelligence and local knowledge to select and refine the 5km square areas of interest. Additional data sources brought in at this point include high resolution imagery and existing topographic mapping.
Detalhes
-
Data do documento
2012/11/01
-
TIpo de documento
Documento de Trabalho
-
No. do relatório
79696
-
Nº do volume
1
-
Total Volume(s)
1
-
País
-
Região
-
Data de divulgação
2013/07/30
-
Disclosure Status
Disclosed
-
Nome do documento
Afghanistan - South-East Copper Segment Resource Corridor Pilot Study : task 2 method statement
-
Palavras-chave
quality management system;sphere of influence;high resolution imagery;local condition;local knowledge;project types;surface type;agricultural area;data sharing;natural environment;digital map;topographic mapping;satellite imagery;chicken farm;power line;Agriculture;drainage;dam;Electricity;
- Exibir mais
Downloads
COMPLETAR RELATÓRIO
Versão oficial do documento (pode conter assinaturas, etc.)
- DOCX
- PDF oficial
- TXT*
- Total Downloads** :
- Download Stats
-
*A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.