Detalhes
-
Autor
JianXie
-
Data do documento
2016/02/29
-
TIpo de documento
Project Information and Integrated Safeguards Data Sheet
-
No. do relatório
PIDISDSC15921
-
Nº do volume
1
-
Total Volume(s)
1
-
País
-
Região
-
Data de divulgação
2016/03/10
-
Disclosure Status
Disclosed
-
Nome do documento
Concept Project Information Document-Integrated Safeguards Document - Absheron Lakes Cleanup and Rehabilitation - P157091
-
Palavras-chave
wastewater treatment and disposal;solid waste management facility;Environmental and Social Impact;Environmental and Social Safeguard;wastewater collection and treatment;health risks from pollution;quality of water;water quality monitoring;investment and development;land use planning;displacement of people;contamination of soil;solid waste treatment;land and water;source of pollution;national environmental legislation;income generation opportunities;vulnerable population group;Investment Project Financing;institutional capacity building;improved water quality;land acquisition;lake habitat;oil production;contaminated site;ecological restoration;water bodies;involuntary resettlement;industrial units;land contamination;adjacent land;environmental condition;river channel;financial resource;environmental asset;water system;marsh areas;sewage collection;sustainable way;regulatory improvement;ecological regeneration;aquatic species;oxygen level;contaminated land;lake management;high salinity;safeguards data;targeted intervention;private entity;pollution load;oil field;fixed parameter;investment opportunities;pollution issues;hydrocarbon contamination;oil exploration;oil contamination;drainage area;biological value;human settlement;housing development;seasonal precipitation;watershed areas;water surface;railway infrastructure;environmental infrastructure;natural habitat;residual waste;sewage water;social aspect;mitigation measure;monitoring program;institutional responsibilities;institutional process;property price;contaminated soil;wetland area;ecological status;international waterway;water level;project intervention;riparian country;public consultation;accessible location;affected persons;maintenance expenses;citizen engagement;sustainable financing;contaminated water;contaminated sediment;oil well;shore line;international standard;pollution control;stakeholder consultation;physical characteristic;safeguard analysis;lake form;safeguards requirement;stakeholder engagement;waste incineration;public health;cleanup effort;local population;technical expertise;land degradation;land development;urban sprawl;oil sector;environmental consequence;water pollution;ecological protection;waste pollution;landscape degradation;urban development;environmental health;vulnerable group;environmental issue;household level;financing source;residential expansion;natural asset;human capital;employment opportunities;cleanup operations;environmental pollution;external support;employment opportunity;productive use;
Exibir mais
Downloads
COMPLETAR RELATÓRIO
Versão oficial do documento (pode conter assinaturas, etc.)
- PDF oficial
- TXT*
- Total Downloads** :
- Download Stats
-
*A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.