Skip to Main Navigation

Vietnam - Additional Financing for the Second Transmission and Distribution Project (Inglês)

Detalhes

  • Data do documento

    2011/02/24

  • TIpo de documento

    Folhas de Dados Integradas sobre Salvaguardas

  • No. do relatório

    AC5617

  • Nº do volume

    1

  • Total Volume(s)

    1

  • País

    Vietnã,

  • Região

    Leste Asiático e Pacífico,

  • Data de divulgação

    2011/03/01

  • Disclosure Status

    Disclosed

  • Nome do documento

    Vietnam - Additional Financing for the Second Transmission and Distribution Project

  • Palavras-chave

    Environmental and Social Impact;transmission and distribution system;construction of access road;Safeguard Policies;safeguard policy;kv transmission line;availability of power;market transition;power transmission capacity;safety of dam;adverse environmental impact;acquisition of land;loss of land;electricity generation market;rights of way;physical cultural resources;resettlement planning process;electric power supply;thermal power plant;power transmission system;response to crisis;natural habitat;safeguard issue;replacement cost;Power Generation;public meeting;Ethnic Minorities;land acquisition;mitigation measure;kv substation;soil erosion;electromagnetic radiation;competitive selection;health hazard;involuntary resettlement;similar provision;management board;special care;reserved land;transmission activity;power availability;national environmental;generation plant;back up;dirty fuel;population center;permanent loss;Indigenous Peoples;stakeholder concern;affected households;investment loan;socioeconomic survey;participation process;land use;infrastructure service;financing activities;transmission tower;water quality;public place;local ngo;institutional responsibilities;project costing;road damage;building material;remedial measure;Environmental Assessment;monitor performance;management oversight;prior review;international waterway;metropolitan area;drop out;investment component;independent agency;physical characteristic;safeguard analysis;river system;industrial zone;protected area;biodiversity value;market rate;compensation rate;government regulation;inland waterway;Electricity Market;ethnic group;construction period;environmental safeguard;irreversible impacts;population settlements;subproject appraisal;social issue;Social Assessment;monitoring agency;environmental specialist;

Downloads

COMPLETAR RELATÓRIO

Versão oficial do documento (pode conter assinaturas, etc.)

  • PDF oficial
  • TXT*
  • Total Downloads** :
  • Download Stats
  • *A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.