Skip to Main Navigation

Thailand - Power Transmission Project (Inglês)

This is the Implementation Completion Report (ICR) for the Power Transmission Project in Thailand. These objectives may briefly be stated as follows: (a) expand and strengthen Electricity Generating Authority of Thailand's (EGAT) transmission system; (b) achieve a better integration of the national grid so that optimal generating options may be chosen in future without being unduly restricted by regional constraints; (c) reduce reserve margin for the system as a whole; and (d) upgrade the existing load dispatch centers into a state-of-the-art countrywide control system. Bank's performance was satisfactory. Borrower's performance was satisfactory. The key lessons learned were as follows: (i) EGAT readily accesses expertise and resources from consultants when it is not available amongst its ranks; (ii) to complete projects rapidly and efficiently, executing institutions need to anticipate problems and obtain environmental and other clearances prior to project preparation; and (iii) the attrition of experienced staff need to be reversed through appropriate programs, including better compensation and reinforced training programs.

Detalhes

Downloads

COMPLETAR RELATÓRIO

Versão oficial do documento (pode conter assinaturas, etc.)

  • PDF oficial
  • TXT*
  • Total Downloads** :
  • Download Stats
  • *A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.