This is the Implementation Completion Report (ICR) for the Power Transmission Project in Thailand. These objectives may briefly be stated as follows: (a) expand and strengthen Electricity Generating Authority of Thailand's (EGAT) transmission system; (b) achieve a better integration of the national grid so that optimal generating options may be chosen in future without being unduly restricted by regional constraints; (c) reduce reserve margin for the system as a whole; and (d) upgrade the existing load dispatch centers into a state-of-the-art countrywide control system. Bank's performance was satisfactory. Borrower's performance was satisfactory. The key lessons learned were as follows: (i) EGAT readily accesses expertise and resources from consultants when it is not available amongst its ranks; (ii) to complete projects rapidly and efficiently, executing institutions need to anticipate problems and obtain environmental and other clearances prior to project preparation; and (iii) the attrition of experienced staff need to be reversed through appropriate programs, including better compensation and reinforced training programs.
Detalhes
-
Data do documento
1995/06/20
-
TIpo de documento
Conclusão da Implementação e Relatórios sobre Resultados
-
No. do relatório
14633
-
Nº do volume
1
-
Total Volume(s)
1
-
País
-
Região
-
Data de divulgação
2010/06/18
-
Disclosure Status
Disclosed
-
Nome do documento
Thailand - Power Transmission Project
-
Palavras-chave
Thermal power plants; Power distribution; Lignite; Natural gas; Construction; Coal mines; Transmission lines; Rural development
- Exibir mais
Downloads
COMPLETAR RELATÓRIO
Versão oficial do documento (pode conter assinaturas, etc.)
- PDF oficial
- TXT*
- Total Downloads** :
- Download Stats
-
*A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.