Georgia - Second Regional and Municipal Infrastructure Development Project : environmental assessment (Vol. 18) : Environmental and social screening, and environmental management plan for village Tsikhisdziri kindergarten (Mtskheta municipality) rehabilitation (Inglês)

The objective of the Second Regional and Municipal Infrastructure Development Project for Georgia is to improve access to and quality of municipal services and infrastructure. Some of the negative impacts and mitigation measures include: revision of vehicles will be required to ensure that there is no leakage of fuel and lubricating materials. All machinery will be maintained and operated such that all leaks and spills of materials will be minimized. Daily plant checks (vehicle maintenance procedure) will be undertaken to ensure no leaks or other problems are apparent. Vehicle maintenance, cleaning, degreasing etc. will be undertaken in designated areas, of hard-standing, not over made ground. Maintenance points will not be located within 50m of any watercourse; lubricants, fuel and solvents should be stored and used for servicing machinery exclusively in the designated sites, with adequate lining of the ground and confinement of possible operation and emergency spills. Spill containment materials (sorbents, sand, sawing, chips etc.) should be available on construction site; waste collection and disposal pathways and sites will be identified for all major waste types expected from construction activities; mineral construction and demolition wastes will be separated from general refuse, organic, liquid and chemical wastes by on-site sorting and stored in appropriate containers; contractor will be required to submit to the MDF copies of the licenses, permits, written agreements, certificates, etc. to prove that all materials are obtained from licensed providers; and reinstate used sections of quarries and/or borrowing areas as extraction proceeds on or properly close quarries if extraction completed and license expired.

Detalhes

  • Autor

    Kapanadze,Darejan

  • Data do documento

    2017/03/07

  • TIpo de documento

    Avaliação Ambiental

  • No. do relatório

    SFG3121

  • Nº do volume

    18

  • Total Volume(s)

    23 (Ver todos os volumes)

  • País

    Geórgia,

  • Região

    Europa e Ásia Central,

  • Data de divulgação

    2017/03/07

  • Disclosure Status

    Disclosed

  • Nome do documento

    Environmental and social screening, and environmental management plan for village Tsikhisdziri kindergarten (Mtskheta municipality) rehabilitation

  • Palavras-chave

    Regional and Municipal Infrastructure;construction and demolition waste;municipal water supply system;traffic and pedestrian;Environmental and Social Impact;mitigation measure;written agreement;construction work;construction site;civil works;social and environmental;Education and Development;vehicle maintenance;acquisition of land;local municipality;public consultation;brick wall;national regulatory system;hot water supply;central sewerage system;wastewater treatment facility;water supply point;Environmental Management Plan;physical cultural resources;windows and door;social screening;adverse environmental effect;disposal of waste;international good practice;conditions for child;wastewater treatment system;displacement of people;local population;Parking Lot;construction material;domestic waste;site inspection;land plot;toxic material;local resident;municipal property;heating system;window frame;construction machinery;sewage system;natural environment;warning signs;construction activities;truck load;residential building;cadastral information;construction waste;local public;security measure;public use;consultation process;hard copy;construction phase;stakeholder consultation;emergency personnel;health provision;site map;personal safety;sewage network;positive impact;written permission;license agreement;recreational area;removed asbestos;unauthorized access;local traffic;transport activity;rush hour;livestock movement;fuel spill;waste collection;waste type;chemical waste;peak traffic;social environment;biological activity;supply schedule;adjacent land;vehicle movement;vegetative growth;physical activity;job opportunity;building site;wastewater system;land take;cover material;safeguard specialist;municipal sewerage;demolition debris;heavy rain;water meter;river bed;storage area;environmental permit;subproject preparation;heavy machinery;land acquisition;atmospheric air;governing body;municipal landfill;pollutant concentration;power supply;air compressor;mechanical equipment;residential area;land use;Public Services;Waste Material;music school;medical waste;open burn;sediment control;water consumption;private property;construction documents;protective barrier;temporary storage;permanent loss;living condition;works contract;screening procedure;access road;social requirement;social issue;hazardous work;schooling process;job opportunities;construction accident;accessible site;agricultural land;disposal site;aquatic life;water license;safety glass;fruit tree;environmental review;historic building;protected area;entrance gate;equipment failure;national regulation;sanitary wastes;asbestos material;traffic diversion;public pedestrian;

Downloads

COMPLETAR RELATÓRIO

Versão oficial do documento (pode conter assinaturas, etc.)

  • DOCX
  • PDF oficial
  • TXT*
  • Total Downloads** :
  • Download Stats
  • *A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.