Detalhes
-
Autor
Arone Malendza
-
Data do documento
2021/10/27
-
TIpo de documento
Plano de Aquisições
-
No. do relatório
STEP56231
-
Nº do volume
1
-
Total Volume(s)
1
-
País
-
Região
-
Data de divulgação
2021/10/27
-
Disclosure Status
Disclosed
-
Nome do documento
Mozambique - AFRICA EAST- P158249- Power Efficiency and Reliability Improvement Project (PERIP) - Procurement Plan
-
Palavras-chave
Environmental and Social Management Framework; rehabilitation of distribution system; data envelope; market approach; project operation; standard design; transmission and distribution; energy for all; Business Process Review; loss reduction; Revised Plan Date; contract completion; grid code; distribution network; grid access; credit contract; call center; functional specifications; application integration; power quality; engineering study; technical proposal; distribution infrastructure; infrastructure network; compensation system; transmission line; infrastructure component; protection strategy; engineering design; data center; laptop computer; data architecture; high sea; tariff study; electricity law; investment infrastructure; procurement method; ict infrastructure; procurement manual; infrastructure program; investment component; procurement arrangement; project effectiveness; testing procedure; telecommunication infrastructure; restructuring process; procurement process; construction quality; technical standard; site survey; project selection; insurance system
- Exibir mais
Downloads
COMPLETAR RELATÓRIO
Versão oficial do documento (pode conter assinaturas, etc.)
- PDF oficial
- TXT*
- Total Downloads** :
- Download Stats
-
*A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.