Detalhes
-
Autor
Arone Malendza
-
Data do documento
2021/09/21
-
TIpo de documento
Plano de Aquisições
-
No. do relatório
STEP54605
-
Nº do volume
1
-
Total Volume(s)
1
-
País
-
Região
-
Data de divulgação
2021/09/21
-
Disclosure Status
Disclosed
-
Nome do documento
Mozambique - AFRICA EAST- P158249- Power Efficiency and Reliability Improvement Project (PERIP) - Procurement Plan
-
Palavras-chave
Environmental and Social Management Framework; rehabilitation of distribution system; data envelope; market approach; energy for all; Business Process Review; Revised Plan Date; loss reduction; project operation; standard design; transmission and distribution; contract completion; distribution network; grid code; credit contract; grid access; functional specifications; call center; application integration; power quality; engineering study; distribution infrastructure; engineering design; infrastructure network; compensation system; transmission line; infrastructure component; protection strategy; technical proposal; data center; data architecture; laptop computer; high sea; tariff study; electricity law; investment infrastructure; procurement method; ict infrastructure; procurement manual; infrastructure program; investment component; procurement arrangement; project effectiveness; testing procedure; telecommunication infrastructure; restructuring process; procurement process; construction quality; technical standard; site survey; project selection; insurance system
- Exibir mais
Downloads
COMPLETAR RELATÓRIO
Versão oficial do documento (pode conter assinaturas, etc.)
- PDF oficial
- TXT*
- Total Downloads** :
- Download Stats
-
*A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.