Detalhes
-
Data do documento
2003/09/03
-
TIpo de documento
Revisão do Relatório de Conclusão da Implementação
-
No. do relatório
ICRR11637
-
Nº do volume
1
-
Total Volume(s)
1
-
País
-
Região
-
Data de divulgação
2016/09/25
-
Disclosure Status
Disclosed
-
Nome do documento
Tanzania - Railways Restructuring
-
Palavras-chave
freight traffic;Financial Management and Accounting;substantial equity participation;procurement of equipment;provision of equipment;public awareness campaign;financial accounting system;staff productivity;financial problem;financial sustainability;financial provisions;rail operator;wage structure;concession bidding;operational objectives;asset valuation;telecommunications system;incentive structure;passenger coach;operational performance;mechanical engineering;safeguard policy;credit agreement;political risk;flexible criteria;long-term management;working condition;incentive scheme;Safeguard Policies;tracking system;management autonomy;commercially viable;infrastructure asset;operational asset;domestic traffic;project costing;project datum;track maintenance;shunting locomotive;emergency works;legal basis;evaluation system;relief equipment;financial reporting;degree of performance;rail sector;freight transport;pension liabilities;
- Exibir mais
Downloads
COMPLETAR RELATÓRIO
Versão oficial do documento (pode conter assinaturas, etc.)
- PDF oficial
- TXT*
- Total Downloads** :
- Download Stats
-
*A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.