Detalhes
-
Data do documento
1990/12/21
-
TIpo de documento
Relatório de Conclusão do Projeto.
-
No. do relatório
9226
-
Nº do volume
1
-
Total Volume(s)
1
-
País
-
Região
-
Data de divulgação
2010/06/18
-
Disclosure Status
Disclosed
-
Nome do documento
Colombia - Bogota Power Distribution Project
-
Palavras-chave
transmission and distribution system;preparation of bidding documents;Project Preparation and Appraisal;investment program;internal cash generation;energy loss;condition of effectiveness;overdue accounts;power loss;penalties for fraud;bank's procurement guidelines;bank supervision missions;energy distribution system;energy and power;authorization of contract;government's development strategy;power sector expansion;bank's procurement procedures;bid evaluation process;average tariff increase;average incremental cost;freedom of action;fixed monthly charge;increase tariff;interest during construction;total debt service;forecast balance sheet;high energy loss;urban population growth;Solid Waste Management;infrastructure and services;informal housing areas;import license;bank's guidelines;procurement process;distribution facility;residential tariff;account receivable;Hydro Power;transmission line;financial efficiency;power company;tariff structure;power system;external borrowing;street light;tariff policy;colombian peso;installed capacity;special account;sales growth;congressional approval;borrower performance;Consulting services;financial capability;local legislation;local costs;account payable;foreign costs;financial difficulties;transmission system;income statement;planning activity;residential consumption;village electrification;industrial categories;energy operation;statistical data;dam strengthening;electric utilities;legal advice;power factor;communications equipment;Electric Power;economic recession;government entity;loss reduction;debt crisis;Positive Action;engineering design;load center;national resource;supervisory agency;administrative aspects;contracting procedure;land purchase;demand estimates;external intervention;unforeseen circumstance;asset insurance;civil works;bank participation;procedural delays;publicity campaign;professional advice;special arrangement;procurement program;bank's comments;reporting requirement;retroactive financing;procurement staff;procurement problems;debt-equity ratio;electricity rate;uniform tariff;residential sector;prospective bidder;financial covenant;electricity service;coverage ratio;bidding procedures;bank's agreement;financial indicator;forecast performance;energy purchase;guarantee agreement;commercial term;regional planning;financing capacity;bank borrower;voluntary association;serviced land;water authority;municipal account;thermal plant;loan account;title registration;financial situation;consumer category;commercial tariff;urban transport;project costing;urban efficiency;institutional mechanism;complementary policies;procurement rule;tariff study;statistical information;energy source;macro policies;macro policy;annex annex;hydro site;energy requirement;
- Exibir mais
Downloads
COMPLETAR RELATÓRIO
Versão oficial do documento (pode conter assinaturas, etc.)
- PDF oficial
- TXT*
- Total Downloads** :
- Download Stats
-
*A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.