Detalhes
-
Data do documento
2006/08/14
-
TIpo de documento
Revisão do Relatório de Conclusão da Implementação
-
No. do relatório
ICRR12435
-
Nº do volume
1
-
Total Volume(s)
1
-
País
-
Região
-
Data de divulgação
2016/09/28
-
Disclosure Status
Disclosed
-
Nome do documento
Poland - Roads 2 Project
-
Palavras-chave
bank's country assistance;private sector participation in infrastructure;road and bridges;Internal rate of return;road user charge;national road network;performance monitoring indicator;number of road;road safety initiative;road safety program;adverse environmental impact;provision of equipment;negative environmental impact;early warning system;contract for work;involuntary resettlement;lack of evidence;rehabilitation of road;road safety situation;quality at entry;counterpart funding;land acquisition;flood damage;supervision cost;road sector;civil works;domestic contractor;road maintenance;policy requirement;local costs;appraisal costs;documentation costs;environmental issue;baseline data;national traffic;rumble strip;total traffic;local contract;advance payment;contract condition;safety improvement;monitoring activity;Bank Policies;local resident;road work;insufficient information;construction site;cats eye;public concern;Flood Prevention;road section;institution building;black spot;railway sector;hazardous locations;crash decline;road crash;preventive measure;drainage system;vehicle type;retaining wall;Traffic Safety;division manager;project costing;project datum;road engineering;emergency reconstruction;Combined Transport;traffic diversion;Project Monitoring;road funding;future investment;
- Exibir mais
Downloads
COMPLETAR RELATÓRIO
Versão oficial do documento (pode conter assinaturas, etc.)
- PDF oficial
- TXT*
- Total Downloads** :
- Download Stats
-
*A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.