Armenia - Electricity Transmission Network Improvement Project : Environmental Assessment : Environmental Management Plan for Rehabilitation of Ararat-2 Substation (English)

The development objectives of the Electricity Transmission Network Improvement Project (ETNIP) for Armenia are to enhance the readiness of the High Voltage Electric Networks (HVEN) and Yerevan Thermal Power Plant (TPP) to implement ETNIP, and to strengthen the capacity of HVEN and Yerevan TPP. Some of the negative impacts and mitigation measures include: (i) installation and fixation of cranes in a stable position to prevent their tipping or spontaneous displacement under the action of its own weight, and the engine; (ii)closing the engine covers of generators, air compressors and other powered mechanical equipment during operations, and placing of equipment as far away from residential areas as possible; (iii) purchase of construction materials from the registered providers; (iv) adequate technical condition of vehicles and machinery; (v) no excessive exhaust; (vi) washing of cars and construction equipment outside the construction site or on maximum distance from natural streams; (vii) timely disposal of wastes to the formally designated locations; (viii) arrangement and maintenance of toilets in compliance with sanitation norms at the construction site; (ix) watering of roof sheets during removal to minimize dust generation; and (x) preparation of toxic waste for on-site storage through placement in containers and full labeling.

Details

  • Author

    Armenia

  • Document Date

    2020/06/01

  • Document Type

    Environmental Assessment

  • Report Number

    SFG3393

  • Volume No

    1

  • Total Volume(s)

    1

  • Country

    Armenia,

  • Region

    Europe and Central Asia,

  • Disclosure Date

    2020/09/14

  • Disclosure Status

    Disclosed

  • Doc Name

    Environmental Management Plan for Rehabilitation of Ararat-2 Substation

  • Keywords

    construction site; mitigation measure; Environmental and Social Impact; temporary storage of wastes; Occupational health and safety; pollution of soil; mercury vapor lamp; toxic waste; health hazard; construction waste; generation of waste; temporary access road; ground water; water supply pipeline; Environmental Management Plan; first aid kit; disposal of waste; replacement of water; grievance redress mechanism; hazardous waste management; construction equipment; electric power distribution; personal protective gear; average wind speed; average annual temperature; average annual precipitation; waste management operations; absolute minimum temperature; costs of mitigation; construction and operation; sanitary sewer system; Environmental Mitigation Plan; impact on health; safety of worker; types of wastes; machinery and equipment; terms of contract; loss of vegetation; surface water body; implementation of mitigation; cost of waste; construction management; conditions at work; preventative maintenance; waste disposal site; national environmental legislation; fire safety requirements; preventive maintenance; availability of labor; web site address; safety of staff; University Armenia; corrective action; public consultation; obsolete equipment; construction material; construction machinery; sanitary condition; accidental spillage; oil leakage; construction phase; demolition debris; storage area; national regulation; mitigation cost; civil works; asbestos waste; project costing; safety training; electrical equipment; truck load; oil product; visual inspection; water pipeline; fire alarm; remedial action; steel structure; construction activities; land plot; circuit breaker; record keeping; ventilation system; Safeguard Policies; residential area; legal framework; written agreement; construction work; noise level; public road; spill response; dust generation; emergency preparedness; public feedback; fire extinguisher; protective equipment; open burn; oil tank; construction contractor; emergency response; security system; entrance gate; hazardous substance; national legislation; poisonous snakes; average temperature; expert examination; electric network; mercury lamps; safeguard policy; water distribution; waste handling; the administration; secure storage; maximum temperature; waste transportation; recycling facility; undeveloped land; electrical safety; routine inspection; rush hour; environmental pollution; transport activity; local traffic; safe passage; assessment result; local license; relative humidity; used oil; storage space; groundwater pollution; storage tank; heavy traffic; work accident; personal protection; traffic diversion; warning signs; natural regeneration; flat topography; vegetation cover; air hose; supply reliability; rubber gloves; safety inspection; fire station; protective clothing; extreme temperature; eye protection; ultraviolet light; response plan; work performance; electrical supply; compressed air; installed capacity; wire rope; electric cable; hand tool; emission control; dust spraying; mechanical equipment; Waste Material; industrial consumer; air compressor; waste quantities; continental climate; environmental monitoring; environmental supervision; field work; social compliance; safeguards compliance; field monitoring; waste composition; safe container; physical hazard; chemical exposure; waste container; emergency responder; oil leaks; safe storage; preparatory work; electrical lines; transmission network; liquid waste; safety device; safety engineering; basic requirement; transmission asset; outdated technology; human life; authorized body; waste generator; power supply; equipment operation; waste producers; community health; construction permit; legal act; regulatory measure; Natural Resources; substation equipment; infrastructure legislation; toxic soil; corruption center; transparency international; lightning protection; fire protection; stormwater drainage; outdoor lighting; emergency situation

Downloads

COMPLETE REPORT

Official version of document (may contain signatures, etc)

  • Official PDF
  • TXT*
  • Total Downloads** :
  • Download Stats
  • *The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.

Citation

Armenia

Armenia - Electricity Transmission Network Improvement Project : Environmental Assessment : Environmental Management Plan for Rehabilitation of Ararat-2 Substation (English). Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/270141495662899977/Environmental-Management-Plan-for-Rehabilitation-of-Ararat-2-Substation