Details
-
Author
-
Document Date
2020/12/22
-
Document Type
Implementation Status and Results Report
-
Report Number
ISR44875
-
Volume No
1
-
Total Volume(s)
1
-
Country
-
Region
-
Disclosure Date
2020/12/22
-
Disclosure Status
Disclosed
-
Doc Name
Disclosable Version of the ISR - CO Rio Bogota Environmental Recuperation and Flood Control Project - P111479 - Sequence No : 20
-
Keywords
integrated water resources management; flood control work; flood control protection; Investment Project Financing; treatment plant; environmental restoration; civil works; environmental asset; effluent discharge; result indicator; disbursement ratio; water utility; public source; operation risk; risk category; basin committee; water global; metropolitan area; hydrological model; sanitary measure; flood risk; construction work; power line; water utilities; metropolitan region; under contract; return period; water quality
- See More
Downloads
COMPLETE REPORT
Official version of document (may contain signatures, etc)
- Official PDF
- TXT*
- Total Downloads** :
- Download Stats
-
*The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.
Citation
Serrano,Hector Alexander
Disclosable Version of the ISR - CO Rio Bogota Environmental Recuperation and Flood Control Project - P111479 - Sequence No : 20 (English). Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/465471608605263069/Disclosable-Version-of-the-ISR-CO-Rio-Bogota-Environmental-Recuperation-and-Flood-Control-Project-P111479-Sequence-No-20