Skip to Main Navigation

Poland - First Transport Project (English)

Ratings for the First Transport Project for Poland were as follows: outcomes were highly satisfactory, Bank performance was satisfactory, and the Borrower performance was also satisfactory. Some lessons learned included: creation of the specialized unit for procurement within the railway, headed by someone with international procurement experience, and the retention of that specialist throughout implementation, was an immense help. Continuity of task manager from the preparation phase through implementation yields considerable benefits in terms of the efficiency and consistency of the Bank's role. A broad initial project in a sector can prove valuable in opening the door for subsequent lending operations which then pursue in more detail and in narrower fields the institutional band policy reforms analyzed under the first operation.

Details

Downloads

COMPLETE REPORT

Official version of document (may contain signatures, etc)

  • Official PDF
  • TXT*
  • Total Downloads** :
  • Download Stats
  • *The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.

Citation

Poland - First Transport Project (English). Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/573181468094784746/Poland-First-Transport-Project