Details
-
Author
-
Document Date
2021/10/22
-
Document Type
Implementation Status and Results Report
-
Report Number
ISR47241
-
Volume No
1
-
Total Volume(s)
1
-
Country
-
Region
-
Disclosure Date
2021/10/22
-
Disclosure Status
Disclosed
-
Doc Name
Disclosable Version of the ISR - WAPP APL4 (Phase 1) - C?te d'Ivoire, Sierra Leone, Liberia, and Guinea Power System Re-development - P113266 - Sequence No : 15
-
Keywords
cost of import; transmission tariff methodology; european investment bank; amount of electricity; cost of electricity; supply and installation; regional transmission; Investment Project Financing; utility level; export capability; least cost; solar development; electricity exchange; operation risk; fiduciary capacity; power system; hydropower scheme; risk category; kv substation
See More
Downloads
COMPLETE REPORT
Official version of document (may contain signatures, etc)
- Official PDF
- TXT*
- Total Downloads** :
- Download Stats
-
*The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.
Citation
Torres De Mastle,Clemencia
Disclosable Version of the ISR - WAPP APL4 (Phase 1) - Cte d'Ivoire, Sierra Leone, Liberia, and Guinea Power System Re-development - P113266 - Sequence No : 15 (English). Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/741891634874045749/Disclosable-Version-of-the-ISR-WAPP-APL4-Phase-1-C-te-dIvoire-Sierra-Leone-Liberia-and-Guinea-Power-System-Re-development-P113266-Sequence-No-15