Details
-
Author
-
Document Date
2014/09/07
-
Document Type
Implementation Status and Results Report
-
Volume No
1
-
Country
-
Region
-
Doc Name
Kenya - Northern Corridor Transport Improvement Project : P082615 - Implementation Status Results Report : Sequence 21
-
Keywords
road section;private sector participation in road;increase efficiency of road transport;road subsector;urban toll road;civil works;security management system;reduction in travel;road investment;security fence;passenger travel time;maintenance of road;civil aviation authority;
- See More
Downloads
COMPLETE REPORT
Official version of document (may contain signatures, etc)
- TXT*
- Total Downloads** :
- Download Stats
-
*The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.
Citation
Sasia,Josphat O.
Kenya - Northern Corridor Transport Improvement Project : P082615 - Implementation Status Results Report : Sequence 21 (English). Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/858901468253442719/Kenya-Northern-Corridor-Transport-Improvement-Project-P082615-Implementation-Status-Results-Report-Sequence-21