Details
-
Document Date
2007/03/01
-
Document Type
Integrated Safeguards Data Sheet
-
Report Number
AC2611
-
Volume No
1
-
Total Volume(s)
1
-
Country
-
Region
-
Disclosure Date
2010/07/01
-
Disclosure Status
Disclosed
-
Doc Name
China - Shi-Zheng Railway Project
-
Keywords
Public Expenditure, Financial Management and Procurement;social and economic development;Land Acquisition and Resettlement;travel time for passenger;Environmental and Social Safeguard;safeguard policy;Safeguard Policies;discharge of sewage;law and regulation;local government official;wastewater treatment facility;resettlement planning process;noise mitigation measure;standard of living;soil erosion prevention;surface water body;soil erosion control;Solid Waste Management;negative social impacts;loss of vegetation;municipal landfill site;high speed line;safety of dam;construction site;noise barrier;compensation rate;access road;railway line;cultural property;affected villages;railway corridor;Traffic Safety;residential area;severance impact;passenger market;affected households;land occupation;budget allocation;public consultation;resettlement strategy;septic tank;air emission;construction period;cultural relic;social disturbance;resettlement impacts;disposal site;public meeting;construction camp;bridge foundation;restoration measure;livelihood development;project costing;electromagnetic radiation;railway alignment;reputational risk;noise impact;field survey;public concern;absorption technique;external monitor;public place;indigenous people;Indigenous Peoples;seasonal rivers;historical site;discussion group;Bank Policies;focus group;monitoring agency;organizational capacity;resettlement supervision;adequate infrastructure;informant interviews;local sector;land holding;construction activities;survey questionnaire;project budgets;project construction;adequate compensation;primary concern;extensive consultation;lost wages;relocation cost;sound insulation;land redistribution;cash compensation;land improvement;land improvements;natural habitat;international waterway;rehabilitation program;construction dust;market segment;Performance Standards;train service;freight service;top soil;agricultural vehicle;passenger station;treatment facilities;noise insulation;dry season;construction wastewater;construction material;flood drainage;bulk material;train speed;social aspect;resettlement policy;minority communities;cultural site;irrigation system;stone work;environmental monitoring;construction stage;protected area;water pollution;land conversion;environmental safeguard;irreversible impacts;safeguard issue;rail transport;freight traffic;physical construction;passenger rail;socio-economic survey;investment loan;project datum;urban construction;agricultural activity;human settlement;flat land;safeguard analysis;physical characteristic;freight train;local ngo;domestic wastewater;environmental specialist;safety helmet;slope protection;institutional responsibilities;basic knowledge;noise reduction;Infectious Disease;Disease Control;public notice;
- See More
Downloads
COMPLETE REPORT
Official version of document (may contain signatures, etc)
- Official PDF
- TXT*
- Total Downloads** :
- Download Stats
-
*The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.
Citation
China - Shi-Zheng Railway Project (English). Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/880741468218983652/China-Shi-Zheng-Railway-Project