Detalhes
-
Data do documento
1999/08/13
-
TIpo de documento
Revisão do Relatório de Conclusão da Implementação
-
No. do relatório
ICRR10517
-
Nº do volume
1
-
Total Volume(s)
1
-
País
-
Região
-
Data de divulgação
2016/09/28
-
Disclosure Status
Disclosed
-
Nome do documento
Bosnia-Herzegovina - Emergency Electric Power Reconstruction
-
Palavras-chave
thermal power plant;hydropower plant;transmission and distribution;short period of time;kv transmission line;sector restructuring;coal mine;power sector restructuring;availability of fund;electric power network;hydro power station;power transformers;electricity service;electricity tariff;coal production;distribution network;kv substation;engineering service;project operation;financial gap;hydropower station;power system;utility vehicle;electricity sale;generation plant;borrower's performance;coal supply;electricity companies;cash operating;project financing;procurement monitoring;local contribution;transmission facility;transmission substations;transmission system;medium voltage;Investment strategies;distribution line;maintenance vehicles;
- Exibir mais
Downloads
COMPLETAR RELATÓRIO
Versão oficial do documento (pode conter assinaturas, etc.)
- PDF oficial
- TXT*
- Total Downloads** :
- Download Stats
-
*A versão do texto é um OCR incorreto e está incluído unicamente em benefício de usuários com conectividade lenta.