Skip to Main Navigation

Mozambique - Malawi Regional Interconnector Project : Environmental Assessment (Vol. 6 of 8) : Appendixes 8-4 : Minutes and Signature for Consultations Round 2 (Inglês)

The development objective of the Malawi Regional Interconnector Project for Mozambique is to interconnect Malawi and Mozambique’s transmission systems and engage in bilateral and regional power trade in the Southern Africa power pool. Some of the negative impacts and mitigation measures include: (1) maintain equipment and machinery in good running condition, including brakes, mufflers and silencers, catalyzers and clean (power washed), free of leaks...
Exibir mais

DETALHES

  • 2019/05/01

  • Avaliação Ambiental

  • SFG5519

  • 6

  • 8 (Ver todos os volumes)

  • África,

  • África,

  • 2019/05/29

  • Disclosed

  • Appendixes 8-4 : Minutes and Signature for Consultations Round 2

DOWNLOADS

COMPLETAR RELATÓRIO

Versão oficial do documento (pode conter assinaturas, etc.)

This document is being processed or is not available.